Video Overview: NetApp Business Continuity Solutions
|
|
A two-part study conducted by Emerson Network Power and the Ponemon Institute found unplanned outages as the most costly line item for organizations.
For a free business continuity assessment,
Call boice.net
at
(502) 271-2149
|
|
|
Unplanned data center outages costs slightly more than $7,900 per minute (Source: Study of Data Center Outages, Ponemon Institute 2013)
|
The above formula shows how you can calculate the cost of downtime for yourself. This is useful in presenting a business case to your organization.
However, this formula doesn't factor in a downtime's impact on reputation, loyalty, and employee productivity and morale.
5 Most Common Causes of Outages:
1. UPS battery failure (55%)
2. Accidental EPO/ human error (48%)
3. UPS capacity exceeded (46%)
4. Cyber attack (34%)
5. IT equipment failure (33%)
Regularly testing and active monitoring of UPS batteries should be a top priority.
Also, use all data center design best practices and redundancy to maintain high availability.
What error detection mechanisms are in place to detect unintended changes? Is there a process for configuration error checking?
|
For More Information and a Disaster Readiness Assessment: |
|
 |
Fill out the form to the right |
 |
Call boice.net today at
(502) 271-2149
|
|
|
|
|
 |
Take the next step:
FILL OUT THIS FORM
Fill out this form to request more information, or to talk to us about FlexPod for your organization
|
|
 |
|
|
|
|